Evaporative Cooler Cleaned and Float Replaced in Parkes

Job summary

An evaporative cooler in Parkes was serviced after the customer requested routine maintenance and the initial fault description raised a possible float issue. A Trimech technician deep-cleaned the cooler, cleaned its pads and base, cleared the drain, replaced a faulty float, and tested operations, which were reported to be working.

Location
Parkes
Date completed
October 19, 2026
Technician name
Jak Lovett

Customer report

The customer advised that the evaporative cooler had been working correctly and requested a basic service. The initial fault description identified a possible need for a new float switch. This was the reported context before the service visit; the customer did not report that the cooler had stopped operating.

Diagnosis & technical assessment

During the visit, the cooler was found to require deep cleaning. The float was identified as faulty. The technician observed that the evaporative pads appeared oversized for the unit and were in poor condition. A separate issue was described in the source notes as a “small lean” at the bottom of the float attachment, coming from the 1/2-inch union. After the cleaning and float replacement, the technician tested all operations and reported that everything was working. The drain was cleared and reported to be draining well.

This job record is derived from first-party technician notes and internal job management systems (SimPRO).

Solutions delivered

The technician completed the evaporative cooler service and deep cleaning. The evaporative pads and base were cleaned, and the drain was cleared. The faulty float was replaced. After these actions, the technician tested the cooler’s operation. The customer was advised that the pads required replacement because of their observed condition and apparent size. The customer was also advised of the issue noted at the 1/2-inch union. These additional items were discussed as prospective work rather than completed repairs.

Tools, parts & systems used

  • Faulty float (replaced)
  • Evaporative cooler, CPL1100-G
  • Evaporative pads, base and drain

Outcome & results

The evaporative cooler service was completed. The drain was reported to be draining well, and operational testing was reported as satisfactory. The faulty float had been replaced. The technician informed the customer of the completed work and left the site clean and tidy. The customer requested quotes for the pads and the separate 1/2-inch union issue.

This job record is derived from first-party technician notes and internal job management systems (SimPRO).

Repair vs replacement

For this job, the identified faulty float was replaced, while the existing evaporative pads were cleaned during the service. The technician separately advised that the pads required replacement because they appeared oversized and were in poor condition. The issue at the 1/2-inch union was also raised with the customer. The record distinguishes the completed float replacement and cleaning from the additional work for which the customer requested quotes.